Power Distribution
Power Distribution System
- low voltage systems up to 5000A / 690V / form 4b
- shock current lp to 220kA
- short-time current resistance lcw to 100kA
Frequency Converters and Inverters
- frequency converters and inverters up to 2,5 MW / 690V
- active front end up to 2,5 MW / 690V
- air or water cooled solutions
Control Automation Systems
- control cabinets with PLC
- highest technical standard and quality
- controls with explosion protection
Engineering, Project Management & Manufacturing
Engineering
- MV/LV technology
- drive technology in MW range
- PLC control and visualization
- CAE in E-Plan P8 or Engineering Base / 3d Planning
- design of rigs and containers
- planning, construction and static calculations
Project Management
- QHSE management
- quality plan for project management
- worldwide delivery
Manufacturing
- execution according to customer requirements
- serial production
- high quality standard
- fully tested before delivery
Test Fields and Load Bank Container
Test Fields
- 2 x test fields each up to 630kVa, 24V to 690V AC (50/60Hz)
- 3 x motor test stands or the load of drives up to 1.200KW
- test of busbar systems up to 4,000 A
- products tested according to test specification and test plan
Container Assembly and Testing Area
- 3 x different assembly areas
- 2 x test areas for container
Load Bank Container
- load bank container up to 2,5 MW at 690V
- loading of frequency converters, generators and ups-systems
- test of diesel engines, grid & generator parallel operation
After Sales & Service
Installation, Commissioning & Training
- rig-up and rig move supervision
- field installation & commissioning
- first operations technical assistance
- on-site & classroom Training
Lifetime Technical Support
- 24/7 service hotline (+49 5922 72 444)
- on-line remote diagnostic, monitoring & troubleshooting
- equipment repairs and major overhauls
- rig and equipment re-certifications
- on-site maintenance support
Spare Parts
- spare parts support and delivery
- worldwide consignation stocks
- up-front spare part packages
- spare part agreements